TY - JOUR AU - Aboutahoun, A. b. d. a. l. l. a. h. AU - Elsafty, F. a. t. m. a. PY - 2021 DA - 2021// TI - A Linear Algorithm for a Minimax Location of a Path-Shaped Facility with a Specific Length in a Weighted Tree Network JO - International Journal of Operational Research VL - 1 UR - https://doi.org/10.1504/IJOR.2021.10016889 DO - 10.1504/IJOR.2021.10016889 ID - Aboutahoun2021 ER - TY - JOUR AU - Alizadeh, B. AU - Etemad, R. PY - 2016 DA - 2016// TI - Linear time optimal approaches for reverse obnoxious center location problems on networks JO - Optimization VL - 65 UR - https://doi.org/10.1080/02331934.2016.1203915 DO - 10.1080/02331934.2016.1203915 ID - Alizadeh2016 ER - TY - JOUR AU - Averbakh, I. AU - Berman, O. PY - 1999 DA - 1999// TI - Algorithms for path medi-centers of a tree JO - Comput. Oper. Res. VL - 26 UR - https://doi.org/10.1016/S0305-0548(99)00042-8 DO - 10.1016/S0305-0548(99)00042-8 ID - Averbakh1999 ER - TY - JOUR AU - Becker, R. I. PY - 1990 DA - 1990// TI - Inductive algorithms on finite trees JO - Quaest. Math. VL - 13 UR - https://doi.org/10.1080/16073606.1990.9631610 DO - 10.1080/16073606.1990.9631610 ID - Becker1990 ER - TY - JOUR AU - Becker, R. I. AU - Chang, Y. I. AU - Lari, I. AU - Scozzari, A. AU - Strochi, G. PY - 2002 DA - 2002// TI - Finding the ℓ-core of a tree JO - Discrete Appl. Math. VL - 118 UR - https://doi.org/10.1016/S0166-218X(01)00254-2 DO - 10.1016/S0166-218X(01)00254-2 ID - Becker2002 ER - TY - JOUR AU - Becker, R. I. AU - Lari, I. AU - Scozzari, A. PY - 2007 DA - 2007// TI - Algorithms for central-median paths with bounded length on trees JO - European J. Oper. Res. VL - 179 UR - https://doi.org/10.1016/j.ejor.2005.09.049 DO - 10.1016/j.ejor.2005.09.049 ID - Becker2007 ER - TY - JOUR AU - Bhattacharya, B. AU - Shi, Q. AU - Tamir, A. PY - 2009 DA - 2009// TI - Optimal algorithm for the path/tree shaped facility location problems on trees JO - Algorithmica VL - 55 UR - https://doi.org/10.1007/s00453-007-9157-8 DO - 10.1007/s00453-007-9157-8 ID - Bhattacharya2009 ER - TY - BOOK AU - Chankong, V. AU - Haimes, Y. Y. PY - 2008 DA - 2008// TI - Multiobjective decision making: theory and methodology PB - Dover publications CY - New York ID - Chankong2008 ER - TY - JOUR AU - Colebrook, M. AU - Sicilia, J. PY - 2007 DA - 2007// TI - A ploynomial algorithm for the multicriteria cent-dian location problem JO - European J. Oper. Res. VL - 179 UR - https://doi.org/10.1016/j.ejor.2005.11.042 DO - 10.1016/j.ejor.2005.11.042 ID - Colebrook2007 ER - TY - BOOK AU - Ehrgott, M. PY - 2005 DA - 2005// TI - Multicriteria Optimization PB - Springer CY - Berlin ID - Ehrgott2005 ER - TY - JOUR AU - Ehrgott, M. AU - Gandibleux, X. PY - 2007 DA - 2007// TI - Bound sets for biobjective combinatorial optimization problems JO - Comput. Oper. Res. VL - 34 UR - https://doi.org/10.1016/j.cor.2005.10.003 DO - 10.1016/j.cor.2005.10.003 ID - Ehrgott2007 ER - TY - JOUR AU - Ghezavati, V. AU - Hosseinifar, P. PY - 2016 DA - 2016// TI - Application of efficient metaheuristics to solve a new bi-objective optimization model for hub facility location problem considering value at risk criterion JO - Soft Comput. VL - 22 UR - https://doi.org/10.1007/s00500-016-2326-4 DO - 10.1007/s00500-016-2326-4 ID - Ghezavati2016 ER - TY - JOUR AU - Goldman, A. J. PY - 1971 DA - 1971// TI - Optimum center location in simple networks JO - Transport. Sci. VL - 5 UR - https://doi.org/10.1287/trsc.5.2.212 DO - 10.1287/trsc.5.2.212 ID - Goldman1971 ER - TY - JOUR AU - Hamacher, H. W. AU - Labbe, M. AU - Nickel, S. PY - 1999 DA - 1999// TI - Multicriteria network location problems with sum objectives JO - Networks VL - 33 UR - https://doi.org/3.0.CO;2-L DO - 3.0.CO;2-L ID - Hamacher1999 ER - TY - JOUR AU - Hassin, R. AU - Ravi, R. AU - Salman, F. S. PY - 2017 DA - 2017// TI - Multiple facility location on a network with linear reliability order of edges JO - J. Comb. Optim. VL - 34 UR - https://doi.org/10.1007/s10878-017-0121-5 DO - 10.1007/s10878-017-0121-5 ID - Hassin2017 ER - TY - JOUR AU - Kahag, M. R. AU - Niaki, S. T. A. AU - Seifbarghy, M. AU - Zabihi, S. PY - 2019 DA - 2019// TI - Bi-objective optimization of multi-server intermodel hub-location-allocation problem in congested systems: modeling and solution JO - J. Ind. Eng. Int. VL - 15 UR - https://doi.org/10.1007/s40092-018-0288-0 DO - 10.1007/s40092-018-0288-0 ID - Kahag2019 ER - TY - JOUR AU - Kariv, O. AU - Hakimi, S. L. PY - 1979 DA - 1979// TI - An algorithmic approach to network location problems, Part I, The p-centers JO - SIAM J. Appl. Math. VL - 37 UR - https://doi.org/10.1137/0137040 DO - 10.1137/0137040 ID - Kariv1979 ER - TY - JOUR AU - Mahmoud, M. R. AU - Fahmy, H. AU - Labadie, J. W. PY - 2002 DA - 2002// TI - Multicriteria siting and sizing of desalination facilities with geographic information system JO - J. Water Res. Pl- ASCE. VL - 128 UR - https://doi.org/10.1061/(ASCE)0733-9496(2002)128:2(113) DO - 10.1061/(ASCE)0733-9496(2002)128:2(113) ID - Mahmoud2002 ER - TY - JOUR AU - Minieka, E. AU - Patel, N. H. PY - 1983 DA - 1983// TI - On finding the core of a tree with a specified length JO - J. Algorithms VL - 4 UR - https://doi.org/10.1016/0196-6774(83)90015-9 DO - 10.1016/0196-6774(83)90015-9 ID - Minieka1983 ER - TY - JOUR AU - Morgan, C. A. AU - Slater, P. J. PY - 1980 DA - 1980// TI - A linear algorithm for a core of a tree JO - J. Algorithms VL - 1 UR - https://doi.org/10.1016/0196-6774(80)90012-7 DO - 10.1016/0196-6774(80)90012-7 ID - Morgan1980 ER - TY - JOUR AU - Nguyen, K. AU - Vui, P. PY - 2016 DA - 2016// TI - The inverse p-maxian problem on trees with variable edge lengths JO - Taiwanese J. Math. VL - 20 UR - https://doi.org/10.11650/tjm.20.2016.6296 DO - 10.11650/tjm.20.2016.6296 ID - Nguyen2016 ER - TY - JOUR AU - Peng, S. AU - Lo, W. PY - 1996 DA - 1996// TI - Efficient algorithms for finding a core of a tree with specified length JO - J. Algorithms VL - 20 UR - https://doi.org/10.1006/jagm.1996.0022 DO - 10.1006/jagm.1996.0022 ID - Peng1996 ER - TY - JOUR AU - Puerto, J. AU - Rodrigues-Chia, A. M. AU - Tamir, A. AU - Perez-Brito, D. PY - 2006 DA - 2006// TI - The bi-criteria doubly weighted center-median path problem on a tree JO - Networks VL - 47 UR - https://doi.org/10.1002/net.20112 DO - 10.1002/net.20112 ID - Puerto2006 ER - TY - JOUR AU - Raith, A. AU - Ehrgott, M. PY - 2009 DA - 2009// TI - A comparison of solution strategies for biobjective shortest path problems JO - Comput. Oper. Res. VL - 36 UR - https://doi.org/10.1016/j.cor.2008.02.002 DO - 10.1016/j.cor.2008.02.002 ID - Raith2009 ER - TY - JOUR AU - Raith, A. AU - Ehrgott, M. PY - 2009 DA - 2009// TI - A two-phase algorithm for the biobjective integer minimum cost flow problem JO - Comput. Oper. Res. VL - 36 UR - https://doi.org/10.1016/j.cor.2008.06.008 DO - 10.1016/j.cor.2008.06.008 ID - Raith2009 ER - TY - JOUR AU - Ramos, R. M. AU - Ramos, M. T. AU - Colebrook, M. AU - Sicilia, J. PY - 1999 DA - 1999// TI - Locating a facility on a network with multiple median-type objectives JO - Ann. Oper. Res. VL - 86 UR - https://doi.org/10.1023/A:1018902701712 DO - 10.1023/A:1018902701712 ID - Ramos1999 ER - TY - JOUR AU - Rana, R. AU - Garg, D. PY - 2014 DA - 2014// TI - Algorithm for obnoxious facility location problem JO - Int. J. Adv. Technol. VL - 5 ID - Rana2014 ER - TY - JOUR AU - Slater, P. J. PY - 1982 DA - 1982// TI - Locating central paths in a graph JO - Transport. Sci. VL - 16 UR - https://doi.org/10.1287/trsc.16.1.1 DO - 10.1287/trsc.16.1.1 ID - Slater1982 ER - TY - JOUR AU - Steiner, S. AU - Radzik, T. PY - 2008 DA - 2008// TI - Computing all efficient solutions of the biobjective minimum spanning tree problem JO - Comput. Oper. Res. VL - 35 UR - https://doi.org/10.1016/j.cor.2006.02.023 DO - 10.1016/j.cor.2006.02.023 ID - Steiner2008 ER - TY - JOUR AU - Tamir, A. AU - Puerto, J. AU - Mesa, J. A. AU - Rodriguez-Chia, A. M. PY - 2005 DA - 2005// TI - Conditional location of path and tree shaped facilities on trees JO - J. Algorithms VL - 56 UR - https://doi.org/10.1016/j.jalgor.2005.01.005 DO - 10.1016/j.jalgor.2005.01.005 ID - Tamir2005 ER - TY - JOUR AU - Tamir, A. AU - Puerto, J. AU - Perez-Brito, D. PY - 2002 DA - 2002// TI - The centdian subtree on tree network JO - Discrete Appl. Math. VL - 118 UR - https://doi.org/10.1016/S0166-218X(01)00199-8 DO - 10.1016/S0166-218X(01)00199-8 ID - Tamir2002 ER - TY - JOUR AU - Ulungu, E. L. AU - Teghem, J. PY - 1995 DA - 1995// TI - The two-phases method: an efficient procedure to solve bi-objective combinatorial optimization problems JO - Found. Comput. Decision Sci. VL - 20 ID - Ulungu1995 ER - TY - JOUR AU - Wang, H. L. PY - 2017 DA - 2017// TI - An optimal algorithm for the weighted backup 2-center problem on a tree JO - Algorithmica VL - 77 UR - https://doi.org/10.1007/s00453-015-0081-z DO - 10.1007/s00453-015-0081-z ID - Wang2017 ER - TY - JOUR AU - Zaferanieh, M. AU - Fathali, J. PY - 2012 DA - 2012// TI - Finding a core of a tree with pos/neg weight JO - Math. Meth. Oper. Res. VL - 76 UR - https://doi.org/10.1007/s00186-012-0394-5 DO - 10.1007/s00186-012-0394-5 ID - Zaferanieh2012 ER -